PLUGTESTS THE INTEROPERABILITY SERVICE

Triple Play over Broadband & Autoconfig

 
 
 

What participants need to bring

  • Power Cords (euro or shockproof plug)
  • Power supplies and the devices must support 230V/50Hz
  • PCs and own debug software
  • Ethernet Cables to connect their equipment to the test network
  • HUBs for tracing etc..

CPE Requirements

  • The CPE has to be configurable during the event with respect to the IP
    settings, the authentication, the ACS URL and the VPI/VCI settings.
  • The CPE usernames must meet the requirements from TR-069 Chapter 3.4.4
  • CPE vendors have to provide one firmware file which can be placed onto the file server
  • It has to be possible to change the default ACS URL of the CPE
  • The CPE should be prepared with the certificate distributed by CETECOM
    before the meeting
  • The CPE has to be equipped with a power supply suitable for the German
    power mains network (230V/50Hz).

ACS Requirements

  • The ACS has to be configurable during the event with respect
    to the IP settings, the authentication, the CPE address and the CPE
    Configuration parameter
  • The ACS has to be prepared to use usernames and passwords as defined in
    TR-069 Chapter 3.4.4 for Digest authentication
  • The ACS should be prepared with the certificate distributed and signed by
    CETECOM
  • The CPE has to be equipped with a power supply suitable for the German
    power mains network (250V/50Hz).

Equipment provided by the organizer

  • One central -48 VDC power supply
  • One public PC with internet access
  • Free WiFi access
  • Tool Corner with soldering machine, screw drivers, etc.
  • Some 10BT hubs for sniffing and debugging
  • Workspace for every participating Company with 250V/50 Hz Power
    Connections, RJ-45 Sockets for DSL and Ethernet connection to the test
    network
  • Some analogue phones
  • SIP Server
  • RADIUS Server
  • HTTPS/HTTP and FTP Server
  • DSLAM and test network.


Equipment